Date Started: 01/20/2025 Date Finished: N/A Current Dispositon: In Use

A pyro control system!

Google Photos Album (updated as im working on it)

Videos

Receiver Continuity function test

Control/Builder Application v0.1

Control System Full loop test (w/ generic receiver)

Why the V0.1 Boards were terrible.

So the V0.1 boards had some problems. For one, on the cue boards, I forgot pulldown resistors for the continuity circuits into the input shift registers (what detects if a fuse is plugged in), and also forgot pulldown resistors to the firing signals coming out of...

So the V0.2 boards came in today. Less than about a week and a half total turnaround time... Not bad!! That's about the last time we can use "not bad" though because everything after this is bad...

Okay maybe not everything. Lets break down each system and see how I messed it up this time:

Screenshot%202025-02-17%20at%2011.58.43%E2%80%AFPM

5
...

Once again I have a bit of a lapse in blog posting. I think that'll be the case indefinitely here as the general circumstances that draw me here tend to shift with the seasons. While writing about things may vary, me building things won't, so I guess just expect stuff like this.

Cue Modules are c

...